Welcome to Aquarius
The place for Pool, Spa & Luxury
You can check the opening hours (for general guidance) or the live status page (for the most up-to-date insights) to see whether each Aquarius facility is open. This site also offers a page for all the latest news and an image gallery with the latest photos and videos.
Facility Information
(See here for more information about opening hours/dates)
The Pool
The Pool is the main facility offered by Aquarius, and is also home to The Lounge.
It has a depth of 1.8 meters at the deepest point, but depth varies.
The Pool at Aquarius is almost always available in the summer-time, is open in most parts of autumn and spring, but is almost always closed in winter due to cold temperatures.
Sometimes in winter, the Pool can be used for occasional 'cold plunges', where the temperature of the pool water gets so cold that it feels like an ice bath.
The Lounge
The Lounge is included a part of The Pool facility and is a much smaller, shallower bit near the entrance steps. It is shallow enough to lay down in, and can be used as a space to have a drink, have a snack or even relax on one of the inflatable 'lounges'. The Lounge is also home to one of the two heat jets in The Pool so it's probably the warmest place to be (apart from The Spa).
The Spa
The Spa is the smallest facility offered by Aquarius, but is a spot to warm up and relax It has a depth of around 1 meter, however there are raised spots on each side to sit/lay down on.
It offers two distinct features: the main heating jets and additional air bubble jets which can be turned on or off.
The Spa is open most of the year-round, but there's some disruptions during winter (not as much as the Pool) due to cold temperatures.
The Pod
The Pod is an upcoming facility, but will eventually become a changing room/bathroom on one side and a storage space on the other.
The Pod has finished basic construction, but isn't furnished and doesn't have any of the planned amenities installed (it's just a wooden room).
The final works are due to begin at the end of 2024 and should be completed by early 2025.